Build to Size

Plans / Sheds

14x12 lean-to shed

Every board for this shed counted, cut and priced before you drive to the lumberyard. The whole plan is on this page. The full plan set to take to the yard is $19.

Floor
168 sq ft
Wall height
9' 9-5/8"
Height from ground
11' 3-1/8"
Rafters
12 x 2x6
Materials
$3,701
Drag to turn it. Touch a board to see its cut.

Not quite your size? Pull the tape.

Every number on this page redraws: the frame, the list, the drawings and the price.

Roof

The list you take to the lumberyard

Every board, sheet and box of nails, packed into the stock lengths the store sells, so nothing is a guess at the counter.

Lumber
$1,022
Sheet goods
$1,678
Hardware and finish
$1,001
Lumber and materials14x12 lean-to shed
  • 4PT 4x4 x 12 ft$79.92
  • 2PT 2x6 x 12 ft$28.96
  • 10PT 2x6 x 16 ft$199.80
  • 302x4 x 8 ft$130.50
  • 202x4 x 10 ft$129.60
  • 42x4 x 12 ft$31.92
  • 42x4 x 16 ft$45.12
  • 22x6 x 8 ft$14.96
  • 142x6 x 16 ft$230.72
  • 2PT 2x4 x 12 ft$19.36
  • 2PT 2x4 x 16 ft$26.96
  • 21x4 x 8 ft$9.96
  • 21x4 x 12 ft$15.96
  • 41x6 x 16 ft$57.92
Sheet goods
  • 8T&G plywood 3/4" 4x8$471.84
  • 8OSB 7/16" 4x8$135.84
  • 17T1-11 siding 5/8" 4x8$1,070.66
Hardware and finish
  • 8Shingles (bundle, 33.3 sq ft)$295.84
  • 1Synthetic underlayment (roll, 400 sq ft)$89
  • 6Drip edge 10 ft$56.88
  • 3Framing nails 16d (5 lb box)$74.94
  • 3Siding nails 8d galvanized (5 lb box)$83.94
  • 1Roofing nails 1-1/4" (5 lb box)$21.98
  • 24Hurricane ties H2.5A$23.52
  • 3Heavy strap hinges 8" (pair)$56.94
  • 1Gate latch / hasp$12.98
  • 3Gravel 3/4" crushed (cubic yard, bulk)$165
  • 3Exterior paint or stain (1 gal)$119.94
102 boards, about$3,701

Typical Home Depot and Lowe's shelf prices, October 2026. Your store will differ by a few percent.

The drawings

Framing drawn from the same boards the list counts. Hover a member to see what it is.

Skid PT 4x4 12' 0"Skid PT 4x4 12' 0"Skid PT 4x4 12' 0"Skid PT 4x4 12' 0"Rim joist PT 2x6 12' 0"Rim joist PT 2x6 12' 0"Floor joist PT 2x6 13' 9"Floor joist PT 2x6 13' 9"Floor joist PT 2x6 13' 9"Floor joist PT 2x6 13' 9"Floor joist PT 2x6 13' 9"Floor joist PT 2x6 13' 9"Floor joist PT 2x6 13' 9"Floor joist PT 2x6 13' 9"Floor joist PT 2x6 13' 9"Floor joist PT 2x6 13' 9"14' 0"12' 0"16" o.c.
A1Floor framing plan10 floor joists at 16" on center on 4 PT 4x4 skids. 3/4" tongue-and-groove plywood deck.
Floor joist PT 2x6 13' 9"Stud 2x4 9' 5-1/8"Stud 2x4 9' 5-1/8"Stud 2x4 9' 5-1/8"Stud 2x4 9' 5-1/8"Stud 2x4 9' 5-1/8"Stud 2x4 9' 5-1/8"Stud 2x4 9' 5-1/8"Stud 2x4 9' 5-1/8"King stud 2x4 9' 5-1/8"King stud 2x4 9' 5-1/8"Jack stud 2x4 6' 3-1/2"Jack stud 2x4 6' 3-1/2"Header ply 2x6 5' 5"Header ply 2x6 5' 5"Cripple stud 2x4 2' 8-1/8"Cripple stud 2x4 2' 8-1/8"Cripple stud 2x4 2' 8-1/8"Cripple stud 2x4 2' 8-1/8"Bottom plate PT 2x4 14' 0"Top plate 2x4 14' 0"14' 0"9' 9-5/8"
A2Front wall framingDouble doors, 5 ft opening: rough opening 62" x 77", 2x6 header on jack studs. The tall wall of the lean-to.
Skid PT 4x4 12' 0"Rim joist PT 2x6 12' 0"Stud 2x4 9' 5-1/8"Stud 2x4 6' 6"Side stud 2x4 9' 4-1/2"Side stud 2x4 9' 3/4"Side stud 2x4 8' 8-3/4"Side stud 2x4 8' 4-3/4"Side stud 2x4 8' 3/4"Side stud 2x4 7' 8-3/4"Side stud 2x4 7' 4-3/4"Side stud 2x4 7' 3/4"Side stud 2x4 6' 8-3/4"Side stud 2x4 6' 6-5/8"Bottom plate PT 2x4 11' 5"Sloped top plate 2x4 11' 9-1/4"Sloped top plate 2x4 11' 9-1/4"Rafter 2x6 14' 5-1/8"12' 0"6' 10-1/2"
A3Side wall framingStuds step from 9' 9-5/8" at the front to 6' 10-1/2" at the back under a sloped double top plate.
14' 5-1/8" along the top edge plumb cut 14.0° (3/12) two birdsmouths, seat 3-1/2", one per wall
A4Rafter detailCut 12 rafters from 2x6. Plumb cuts at 14.0°. Birdsmouth seat 3-1/2", depth 7/8".

Cut list

Every piece, how many, and how long. Tape it to the saw.

Floor
QtyBoardCut toPart
10PT 2x613' 9"Floor joist16" on center
4PT 4x412' 0"Skidpressure treated, sits on gravel
2PT 2x612' 0"Rim joistside band of the floor frame
Walls
QtyBoardCut toPart
2PT 2x414' 0"Bottom platepressure treated, nailed to the deck
22x414' 0"Top platefirst layer
22x414' 0"Top platesecond layer
42x411' 9-1/4"Sloped top plateends cut at 14.0°
2PT 2x411' 5"Bottom platepressure treated
82x49' 5-1/8"Stud16" on center
22x49' 5-1/8"King studfull height beside the door opening
22x49' 4-1/2"Side studlong point, top cut at 14.0°
22x49' 3/4"Side studlong point, top cut at 14.0°
22x48' 8-3/4"Side studlong point, top cut at 14.0°
22x48' 4-3/4"Side studlong point, top cut at 14.0°
22x48' 3/4"Side studlong point, top cut at 14.0°
22x47' 8-3/4"Side studlong point, top cut at 14.0°
22x47' 4-3/4"Side studlong point, top cut at 14.0°
22x47' 3/4"Side studlong point, top cut at 14.0°
22x46' 8-3/4"Side studlong point, top cut at 14.0°
22x46' 6-5/8"Side studlong point, top cut at 14.0°
122x46' 6"Stud16" on center
22x46' 3-1/2"Jack studcarries the header, rough opening 77" tall
22x65' 5"Header plytwo plies with 1/2" plywood between, on edge
42x42' 8-1/8"Cripple studabove the header, on layout
Roof
QtyBoardCut toPart
122x614' 5-1/8"Raftertwo birdsmouths, seat 3-1/2", ends plumb at 14.0°
22x614' 5-1/8"Barge rafterfly rafter on the side overhang
Doors
QtyBoardCut toPart
42x46' 4"Door stiledoor frame, laid flat
62x41' 11-1/4"Door raildoor frame, between the stiles
Trim
QtyBoardCut toPart
21x615' 0"Fasciafront and back eaves
21x614' 5-1/8"Rake boardalong the side overhangs
21x410' 3-7/8"Corner boardoutside corners over the siding
21x47' 4-3/4"Corner boardoutside corners over the siding

Which piece comes from which board

102 boards, laid out so the offcuts stay small.

2 × 1x4, 12 ftCorner board 10' 3-7/8"Corner board10' 3-7/8"1' 8-1/8" offcut2 × 1x4, 8 ftCorner board 7' 4-3/4"Corner board7' 4-3/4"7-1/4" offcut2 × 1x6, 16 ftFascia 15' 0"Fascia15' 0"1' 0" offcut2 × 1x6, 16 ftRake board 14' 5-1/8"Rake board14' 5-1/8"1' 6-7/8" offcut4 × 2x4, 16 ftTop plate 14' 0"Top plate14' 0"Door rail 1' 11-1/4"Door rail1' 11-1/4"4 × 2x4, 12 ftSloped top plate 11' 9-1/4"Sloped top plate11' 9-1/4"2-3/4" offcut8 × 2x4, 10 ftStud 9' 5-1/8"Stud9' 5-1/8"6-7/8" offcut2 × 2x4, 10 ftKing stud 9' 5-1/8"King stud9' 5-1/8"6-7/8" offcut2 × 2x4, 10 ftSide stud 9' 4-1/2"Side stud9' 4-1/2"7-1/2" offcut2 × 2x4, 10 ftSide stud 9' 3/4"Side stud9' 3/4"11-1/4" offcut2 × 2x4, 10 ftSide stud 8' 8-3/4"Side stud8' 8-3/4"1' 3-1/4" offcut2 × 2x4, 10 ftSide stud 8' 4-3/4"Side stud8' 4-3/4"1' 7-1/4" offcut2 × 2x4, 10 ftSide stud 8' 3/4"Side stud8' 3/4"1' 11-1/4" offcut12 × 2x4, 8 ftStud 6' 6"Stud6' 6"1' 6" offcut4 × 2x4, 8 ftDoor stile 6' 4"Door stile6' 4"1' 8" offcut2 × 2x4, 8 ftSide stud 7' 8-3/4"Side stud7' 8-3/4"3-1/4" offcut2 × 2x4, 8 ftSide stud 7' 4-3/4"Side stud7' 4-3/4"7-1/4" offcut2 × 2x4, 8 ftSide stud 7' 3/4"Side stud7' 3/4"11-1/4" offcut2 × 2x4, 8 ftSide stud 6' 8-3/4"Side stud6' 8-3/4"1' 3-1/4" offcut2 × 2x4, 8 ftSide stud 6' 6-5/8"Side stud6' 6-5/8"1' 5-3/8" offcut2 × 2x4, 8 ftJack stud 6' 3-1/2"Jack stud6' 3-1/2"1' 8-1/2" offcut2 × 2x4, 8 ftCripple stud 2' 8-1/8"Cripple stud2' 8-1/8"Cripple stud 2' 8-1/8"Cripple stud2' 8-1/8"Door rail 1' 11-1/4"Door rail1' 11-1/4"8-1/4" offcut12 × 2x6, 16 ftRafter 14' 5-1/8"Rafter14' 5-1/8"1' 5-3/8" offcut2 × 2x6, 16 ftBarge rafter 14' 5-1/8"Barge rafter14' 5-1/8"1' 5-3/8" offcut2 × 2x6, 8 ftHeader ply 5' 5"Header ply5' 5"2' 7" offcut2 × PT 2x4, 16 ftBottom plate 14' 0"Bottom plate14' 0"2' 0" offcut2 × PT 2x4, 12 ftBottom plate 11' 5"Bottom plate11' 5"7" offcut10 × PT 2x6, 16 ftFloor joist 13' 9"Floor joist13' 9"2' 3" offcut2 × PT 2x6, 12 ftRim joist 12' 0"Rim joist12' 0"4 × PT 4x4, 12 ftSkid 12' 0"Skid12' 0"

Build it in this order

  1. 01

    Check the rules first

    Ask your town about permits and setbacks before you buy lumber. Many towns allow a shed of up to 120 to 200 sq ft without a permit, but rules and HOA covenants vary.

  2. 02

    Make the gravel pad

    Dig out sod for a pad 1 ft wider than the shed on every side (16 x 14 ft), fill with about 3 cubic yards of 3/4" crushed gravel 4" deep, and level it.

  3. 03

    Set the skids

    Lay the 4 PT 4x4 skids along the depth, evenly spaced, and level them to each other. Shim with solid blocks, never with stacked scraps.

  4. 04

    Frame the floor

    Nail the two rim joists to the ends of the 10 floor joists at 16" on center. Check square: the two diagonals must be equal. Toe-screw the frame to the skids.

  5. 05

    Sheath the deck

    Glue and screw the 8 sheets of 3/4" tongue-and-groove plywood, long edges across the joists, joints staggered.

  6. 06

    Build the back wall

    Frame it flat on the deck: bottom plate, 78" studs at 16" on center, first top plate. Raise it, plumb it, brace it.

  7. 07

    Build the front wall

    Same layout with the double doors, 5 ft opening opening: king studs full height, jack studs carrying the 2x6 header, cripples above. Rough opening 62" wide and 77" tall.

  8. 08

    Build the side walls

    Fit them between the front and back walls. Cut each stud to its own length from the cut list so the sloped top plate runs straight from the tall wall to the short one.

  9. 09

    Cut a pattern rafter

    Each rafter gets two birdsmouths, one on each wall. Seat cut 3-1/2", plumb cuts at 14.0°. Test the pattern at both ends of the shed before cutting the rest.

  10. 10

    Set the rafters

    Set rafters at 16" on center from the front wall to the back wall and add a hurricane tie at both ends of every rafter.

  11. 11

    Sheath and roof

    Nail on 8 sheets of 7/16" OSB, then drip edge at the eaves, underlayment, drip edge on the rakes, and shingles from the bottom up.

  12. 12

    Side it and hang the doors

    Nail on the 17 sheets of T1-11 (they also skin the doors). Build the door frames flat, skin them, and hang them on strap hinges. Trim the corners and the fascia.

  13. 13

    Finish

    Prime and paint or stain every cut edge and the siding. Build a short ramp if you will roll a mower in.

Full plan set14x12 lean-to shed
  • Every drawing at full page size, dimensions on every member
  • The cut list on one page, grouped the way you build
  • The cutting diagram for every board
  • The materials list ready to hand to the lumberyard or load into a store cart
  • The build steps with a check at the end of each
  • Your exact size, not the nearest one we had
Total$19
Get the full plan set
Measured twice If a measurement in your plan is wrong, we fix it and send it again.

Before you dig

Do I need a permit for this shed?

168 sq ft. Many towns exempt sheds of 120 sq ft or less (some go to 200), as long as they meet setbacks from the property line. Electricity, plumbing or living space always needs a permit. Call your building department or check the town website before you buy lumber; HOA rules are separate and often stricter.

Is it cheaper to build this or buy a kit?

The lumber and materials for this plan come to about $3,701 at big-box prices. Wood kits of the same size usually cost more and use thinner framing; resin and metal kits cost less but are not the same building. Building from scratch pays when you want 2x4 walls 16 in on center, a real floor and a roof that carries snow.

What foundation does it sit on?

4 pressure-treated 4x4 skids on a 4 in crushed-gravel pad, about 3 cubic yards. It drains, it stays level, and the shed can be moved later. Use concrete piers if your town requires an anchored foundation.

Will the roof hold snow?

This plan uses 2x6 rafters at 16 in on center for little or no snow (up to 20 psf). In a heavier snow area, switch the snow setting in the planner and it upsizes the rafters for you. When in doubt, ask your building department for the local ground snow load.

Can I change the door?

Yes. Set the door in the planner: the rough opening, header, king and jack studs update. This plan has double doors, 5 ft opening with a 62" wide rough opening.

How long does it take?

Most first-time builders frame and roof a shed this size over two to three weekends with a helper. Siding, doors, trim and paint take another weekend.

Other sizes on the rack