Every board for this shed counted, cut and priced before you drive to the lumberyard. The whole plan is on this page. The full plan set to take to the yard is $19.

Floor
100 sq ft
Wall height
8' 1-1/8"
Height from ground
11' 7-1/4"
Rafters
18 x 2x4
Materials
$2,863
Drag to turn it. Touch a board to see its cut.

Not quite your size? Pull the tape.

Every number on this page redraws: the frame, the list, the drawings and the price.

Roof

The list you take to the lumberyard

Every board, sheet and box of nails, packed into the stock lengths the store sells, so nothing is a guess at the counter.

Lumber
$665
Sheet goods
$1,321
Hardware and finish
$878
Lumber and materials10x10 gable shed
  • 3PT 4x4 x 10 ft$49.44
  • 11PT 2x6 x 10 ft$131.78
  • 322x4 x 92-5/8" precut stud$131.20
  • 312x4 x 8 ft$134.85
  • 132x4 x 10 ft$84.24
  • 22x6 x 8 ft$14.96
  • 12x6 x 12 ft$11.98
  • 4PT 2x4 x 10 ft$31.92
  • 41x4 x 10 ft$25.92
  • 41x6 x 8 ft$27.92
  • 21x6 x 12 ft$20.96
Sheet goods
  • 6T&G plywood 3/4" 4x8$353.88
  • 5OSB 7/16" 4x8$84.90
  • 14T1-11 siding 5/8" 4x8$881.72
Hardware and finish
  • 5Shingles (bundle, 33.3 sq ft)$184.90
  • 1Synthetic underlayment (roll, 400 sq ft)$89
  • 5Drip edge 10 ft$47.40
  • 1Ridge cap shingles (bundle, ~20 lin ft)$58
  • 3Framing nails 16d (5 lb box)$74.94
  • 3Siding nails 8d galvanized (5 lb box)$83.94
  • 1Roofing nails 1-1/4" (5 lb box)$21.98
  • 18Hurricane ties H2.5A$17.64
  • 3Heavy strap hinges 8" (pair)$56.94
  • 1Gate latch / hasp$12.98
  • 2Gravel 3/4" crushed (cubic yard, bulk)$110
  • 3Exterior paint or stain (1 gal)$119.94
107 boards, about$2,863

Typical Home Depot and Lowe's shelf prices, October 2026. Your store will differ by a few percent.

The drawings

Framing drawn from the same boards the list counts. Hover a member to see what it is.

Skid PT 4x4 10' 0"Skid PT 4x4 10' 0"Skid PT 4x4 10' 0"Rim joist PT 2x6 10' 0"Rim joist PT 2x6 10' 0"Floor joist PT 2x6 9' 9"Floor joist PT 2x6 9' 9"Floor joist PT 2x6 9' 9"Floor joist PT 2x6 9' 9"Floor joist PT 2x6 9' 9"Floor joist PT 2x6 9' 9"Floor joist PT 2x6 9' 9"Floor joist PT 2x6 9' 9"Floor joist PT 2x6 9' 9"10' 0"10' 0"16" o.c.
A1Floor framing plan9 floor joists at 16" on center on 3 PT 4x4 skids. 3/4" tongue-and-groove plywood deck.
Floor joist PT 2x6 9' 9"Stud 2x4 7' 8-5/8"Stud 2x4 7' 8-5/8"Stud 2x4 7' 8-5/8"Stud 2x4 7' 8-5/8"Stud 2x4 7' 8-5/8"King stud 2x4 7' 8-5/8"King stud 2x4 7' 8-5/8"Jack stud 2x4 6' 3-1/2"Jack stud 2x4 6' 3-1/2"Header ply 2x6 5' 5"Header ply 2x6 5' 5"Cripple stud 2x4 11-5/8"Cripple stud 2x4 11-5/8"Cripple stud 2x4 11-5/8"Cripple stud 2x4 11-5/8"Gable stud 2x4 1' 1-1/2"Gable stud 2x4 1' 9-1/2"Gable stud 2x4 2' 1-1/2"Gable stud 2x4 1' 5-1/2"Gable stud 2x4 9-1/2"Bottom plate PT 2x4 10' 0"Top plate 2x4 10' 0"Rafter 2x4 6' 7-5/8"Rafter 2x4 6' 7-5/8"10' 0"8' 1-1/8"10' 9-1/2" to peak
A2Front wall framingDouble doors, 5 ft opening: rough opening 62" x 77", 2x6 header on jack studs. Gable framing above at 6/12.
Skid PT 4x4 10' 0"Rim joist PT 2x6 10' 0"Stud 2x4 7' 8-5/8"Stud 2x4 7' 8-5/8"Stud 2x4 7' 8-5/8"Stud 2x4 7' 8-5/8"Stud 2x4 7' 8-5/8"Stud 2x4 7' 8-5/8"Stud 2x4 7' 8-5/8"Stud 2x4 7' 8-5/8"Stud 2x4 7' 8-5/8"Stud 2x4 7' 8-5/8"Bottom plate PT 2x4 9' 5"Top plate 2x4 9' 5"Top plate 2x4 10' 0"10' 0"8' 1-1/8"
A3Side wall framingSide walls fit between the front and back walls. Rafter tails overhang 12" past the walls.
6' 7-5/8" along the top edge plumb cut 26.6° (6/12) birdsmouth: seat 2-3/8", depth 1-1/8"
A4Rafter detailCut 18 rafters from 2x4. Plumb cuts at 26.6°. Birdsmouth seat 2-3/8", depth 1-1/8".

Cut list

Every piece, how many, and how long. Tape it to the saw.

Floor
QtyBoardCut toPart
3PT 4x410' 0"Skidpressure treated, sits on gravel
2PT 2x610' 0"Rim joistside band of the floor frame
9PT 2x69' 9"Floor joist16" on center
Walls
QtyBoardCut toPart
2PT 2x410' 0"Bottom platepressure treated, nailed to the deck
22x410' 0"Top platefirst layer
22x410' 0"Top platesecond layer, laps the corners
2PT 2x49' 5"Bottom platepressure treated, nailed to the deck
22x49' 5"Top platefirst layer
22x49' 5"Top platesecond layer, between the side plates
302x47' 8-5/8"Stud16" on center
22x47' 8-5/8"King studfull height beside the door opening
22x46' 3-1/2"Jack studcarries the header, rough opening 77" tall
22x65' 5"Header plytwo plies with 1/2" plywood between, on edge
42x411-5/8"Cripple studabove the header, on layout
Roof
QtyBoardCut toPart
12x611' 0"Ridge boardtop flush with the rafter tops
52x410' 0"Rafter tienailed to both rafters of a pair at the plate
182x46' 7-5/8"Rafterplumb cuts at 26.6°, birdsmouth seat 2-3/8"
42x46' 7-5/8"Barge rafterfly rafter on the gable overhang, no birdsmouth
22x42' 1-1/2"Gable studlong point, top cut at 26.6°
22x41' 9-1/2"Gable studlong point, top cut at 26.6°
22x41' 5-1/2"Gable studlong point, top cut at 26.6°
22x41' 1-1/2"Gable studlong point, top cut at 26.6°
22x49-1/2"Gable studlong point, top cut at 26.6°
Doors
QtyBoardCut toPart
42x46' 4"Door stiledoor frame, laid flat
62x41' 11-1/4"Door raildoor frame, between the stiles
Trim
QtyBoardCut toPart
21x611' 0"Fasciaeave fascia on the rafter tails
41x48' 7-3/8"Corner boardoutside corners over the siding
41x66' 8-1/2"Rake boardalong the gable overhang

Which piece comes from which board

107 boards, laid out so the offcuts stay small.

4 × 1x4, 10 ftCorner board 8' 7-3/8"Corner board8' 7-3/8"1' 4-5/8" offcut2 × 1x6, 12 ftFascia 11' 0"Fascia11' 0"1' 0" offcut4 × 1x6, 8 ftRake board 6' 8-1/2"Rake board6' 8-1/2"1' 3-1/2" offcut5 × 2x4, 10 ftRafter tie 10' 0"Rafter tie10' 0"4 × 2x4, 10 ftTop plate 10' 0"Top plate10' 0"4 × 2x4, 10 ftTop plate 9' 5"Top plate9' 5"7" offcut16 × 2x4, 8 ftRafter 6' 7-5/8"Rafter6' 7-5/8"1' 2-7/8" offcut4 × 2x4, 8 ftBarge rafter 6' 7-5/8"Barge rafter6' 7-5/8"1' 2-7/8" offcut2 × 2x4, 8 ftRafter 6' 7-5/8"Rafter6' 7-5/8"Gable stud 9-1/2"9-1/2"5-1/4" offcut2 × 2x4, 8 ftDoor stile 6' 4"Door stile6' 4"Gable stud 1' 1-1/2"1' 1-1/2"6-3/8" offcut2 × 2x4, 8 ftDoor stile 6' 4"Door stile6' 4"Cripple stud 11-5/8"11-5/8"8-1/4" offcut2 × 2x4, 8 ftJack stud 6' 3-1/2"Jack stud6' 3-1/2"Cripple stud 11-5/8"11-5/8"8-3/4" offcut1 × 2x4, 8 ftGable stud 2' 1-1/2"Gable stud2' 1-1/2"Gable stud 2' 1-1/2"Gable stud2' 1-1/2"Door rail 1' 11-1/4"Door rail1' 11-1/4"Gable stud 1' 5-1/2"Gable stud1' 5-1/2"3-7/8" offcut1 × 2x4, 8 ftDoor rail 1' 11-1/4"Door rail1' 11-1/4"Door rail 1' 11-1/4"Door rail1' 11-1/4"Door rail 1' 11-1/4"Door rail1' 11-1/4"Gable stud 1' 9-1/2"Gable stud1' 9-1/2"4-3/8" offcut1 × 2x4, 8 ftDoor rail 1' 11-1/4"Door rail1' 11-1/4"Door rail 1' 11-1/4"Door rail1' 11-1/4"Gable stud 1' 9-1/2"Gable stud1' 9-1/2"Gable stud 1' 5-1/2"Gable stud1' 5-1/2"10-1/8" offcut30 × 2x4, 92-5/8" studStud 7' 8-5/8"Stud7' 8-5/8"2 × 2x4, 92-5/8" studKing stud 7' 8-5/8"King stud7' 8-5/8"1 × 2x6, 12 ftRidge board 11' 0"Ridge board11' 0"1' 0" offcut2 × 2x6, 8 ftHeader ply 5' 5"Header ply5' 5"2' 7" offcut2 × PT 2x4, 10 ftBottom plate 10' 0"Bottom plate10' 0"2 × PT 2x4, 10 ftBottom plate 9' 5"Bottom plate9' 5"7" offcut9 × PT 2x6, 10 ftFloor joist 9' 9"Floor joist9' 9"3" offcut2 × PT 2x6, 10 ftRim joist 10' 0"Rim joist10' 0"3 × PT 4x4, 10 ftSkid 10' 0"Skid10' 0"

Build it in this order

  1. 01

    Check the rules first

    Ask your town about permits and setbacks before you buy lumber. Many towns allow a shed of this size (120 sq ft or less) without a permit, but rules and HOA covenants vary.

  2. 02

    Make the gravel pad

    Dig out sod for a pad 1 ft wider than the shed on every side (12 x 12 ft), fill with about 2 cubic yards of 3/4" crushed gravel 4" deep, and level it.

  3. 03

    Set the skids

    Lay the 3 PT 4x4 skids along the depth, evenly spaced, and level them to each other. Shim with solid blocks, never with stacked scraps.

  4. 04

    Frame the floor

    Nail the two rim joists to the ends of the 9 floor joists at 16" on center. Check square: the two diagonals must be equal. Toe-screw the frame to the skids.

  5. 05

    Sheath the deck

    Glue and screw the 6 sheets of 3/4" tongue-and-groove plywood, long edges across the joists, joints staggered.

  6. 06

    Build the back wall

    Frame it flat on the deck: bottom plate, 92-5/8" precut studs at 16" on center, first top plate. Raise it, plumb it, brace it.

  7. 07

    Build the front wall

    Same layout with the double doors, 5 ft opening opening: king studs full height, jack studs carrying the 2x6 header, cripples above. Rough opening 62" wide and 77" tall.

  8. 08

    Build the side walls

    Fit them between the front and back walls, then nail the corners. Add the second top plate so it laps every corner.

  9. 09

    Cut a pattern rafter

    Mark the ridge plumb cut at 26.6°, measure 6' 7-5/8" along the top edge to the tail, and cut the birdsmouth with a 2-3/8" seat. Test it at both ends of the shed before you cut the rest.

  10. 10

    Raise the ridge and rafters

    Set the end rafter pairs with the 2x6 ridge between them, then fill in the rest at 16" on center. Nail a rafter tie across every other pair at the plates and add a hurricane tie at each rafter.

  11. 11

    Frame the gable ends

    Cut the gable studs to their lengths from the cut list (top cut at the roof angle) and set them on layout under the end rafters.

  12. 12

    Sheath and roof

    Nail on 5 sheets of 7/16" OSB, then drip edge at the eaves, underlayment, drip edge on the rakes, and shingles from the bottom up.

  13. 13

    Side it and hang the doors

    Nail on the 14 sheets of T1-11 (they also skin the doors). Build the door frames flat, skin them, and hang them on strap hinges. Trim the corners and the fascia.

  14. 14

    Finish

    Prime and paint or stain every cut edge and the siding. Build a short ramp if you will roll a mower in.

Full plan set10x10 gable shed
  • Every drawing at full page size, dimensions on every member
  • The cut list on one page, grouped the way you build
  • The cutting diagram for every board
  • The materials list ready to hand to the lumberyard or load into a store cart
  • The build steps with a check at the end of each
  • Your exact size, not the nearest one we had
Total$19
Get the full plan set
Measured twice If a measurement in your plan is wrong, we fix it and send it again.

Before you dig

Do I need a permit for this shed?

100 sq ft. Many towns exempt sheds of 120 sq ft or less (some go to 200), as long as they meet setbacks from the property line. Electricity, plumbing or living space always needs a permit. Call your building department or check the town website before you buy lumber; HOA rules are separate and often stricter.

Is it cheaper to build this or buy a kit?

The lumber and materials for this plan come to about $2,863 at big-box prices. Wood kits of the same size usually cost more and use thinner framing; resin and metal kits cost less but are not the same building. Building from scratch pays when you want 2x4 walls 16 in on center, a real floor and a roof that carries snow.

What foundation does it sit on?

3 pressure-treated 4x4 skids on a 4 in crushed-gravel pad, about 2 cubic yards. It drains, it stays level, and the shed can be moved later. Use concrete piers if your town requires an anchored foundation.

Will the roof hold snow?

This plan uses 2x4 rafters at 16 in on center for little or no snow (up to 20 psf). In a heavier snow area, switch the snow setting in the planner and it upsizes the rafters for you. When in doubt, ask your building department for the local ground snow load.

Can I change the door?

Yes. Set the door in the planner: the rough opening, header, king and jack studs update. This plan has double doors, 5 ft opening with a 62" wide rough opening.

How long does it take?

Most first-time builders frame and roof a shed this size over two to three weekends with a helper. Siding, doors, trim and paint take another weekend.